Jan 29, 2018 | Hardware Design, Mechanical Design, Milestones, NEWS, Project Managment, Software Design, Telemetry Design
from 23.01 to 26.01 we have been in Munich for the scheduled Bench Test, at this test the rocket is beeing assembled but not started. This is to see if all experiments work nominal in near flight conditions. Day 1 consistet of the assembly of our experiment and quick...Dec 10, 2017 | Hardware Design, Mechanical Design, Milestones, NEWS, Project Managment, Software Design, Telemetry Design
A long time has passed since the last post here on our website. The last time required all our time and concentration, in addition to the study, every free minute of the entire team was used for the production.But it was a long way in the last six months. From...Jul 16, 2017 | Hardware Design, NEWS, Telemetry Design
We can finally present the hardware configuration for our telemetry system. After many problems with the antennas and some different configuration ideas we decided to use a hardware configuration with two separated helix antennas and one dipole quarter-wave for the...Jul 5, 2017 | Hardware Design
The interface PCB between the RXSM (Onboard computer of the Rexus rocket) and our OBRC (Onboard Rocket Computer) has passed the Breadboard Test! That so called Communication and Power board supplies all components of our Experiment onboard the Rexus rocket including...Jan 9, 2017 | Hardware Design, Milestones, NEWS
The idea to our project came to our minds in Summer 2016, after listening to a former REXUS/BEXUS Student team from our University. We applied for a seat on REXUS23/24 Rockets, an got a positive response from ESA in December 2016. For more information about Daedalus,...Nov 28, 2016 | Hardware Design, NEWS
Thanks to Jonas and Florian, they did the CAD Construction and two prototypes, one for design and one for the functional idea of our Space...