Jan 29, 2018 | Hardware Design, Mechanical Design, Milestones, NEWS, Project Managment, Software Design, Telemetry Design
from 23.01 to 26.01 we have been in Munich for the scheduled Bench Test, at this test the rocket is beeing assembled but not started. This is to see if all experiments work nominal in near flight conditions. Day 1 consistet of the assembly of our experiment and quick...Dec 10, 2017 | Hardware Design, Mechanical Design, Milestones, NEWS, Project Managment, Software Design, Telemetry Design
A long time has passed since the last post here on our website. The last time required all our time and concentration, in addition to the study, every free minute of the entire team was used for the production.But it was a long way in the last six months. From...Jul 5, 2017 | Mechanical Design
At the moment, our Simulation Team has got almost no free-time left; As soon as we can, we should decide which sash profile we are going to use for our four wings. Therefore, we have to determine how much lift we can possibly get out of each profile, and which...